Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Unlisted Portfolio

Oros Coal

Hard coking coal projects TVI Nordegg, Bighorn, Ram River West, Haven Creek, Scurry South and a thermal coal project Alexo Saunders
  • 563Mt of historical resource across all projects
  • 300 Drill holes across all projects
  • Excellent access to infrastructure

TVI Nordegg

  • 5km south of the township of Nordegg, and the David Thompson Highway
  • Electrical power is readily available within the project area with high voltage transmission lines 1km away
  • 90km by road to rail head at Rocky Mountain House
  • Access to Ridley and Westshore terminals with available capacity
  • 178Mt historical underground resource, 37Mt clean coal (Consol 1981) and ongoing field work
  • Low volatile bituminous hard coking coal
  • Ash 4-9 %
  • Volatiles 17-19 %
  • Sulfur 0.5-0.6 %
  • Yield 67.5 %
  • FSI 6
  • Open pit upside with a recent independent assessment of surface exploration target resource of 47Mt at 8:1 strip ratio (BCM rock : Metric Tons Raw Coal)